| |
WATER TREATMENT FACILITIES
-
BELLA VISTA, CALIFORNIA
(60 mgd)
Design of all electrical and control systems for
plant wide expansion.
Design electrical and control systems for recycled
water facility to provide cooling water to 880-megawatt power
generation facility.
-
CENTRAL VALLEY, CALIFORNIA (5.5 mgd)
Design of all electrical and control systems.
Assisted with design of electrical and control
systems.
-
FREMONT, CALIFORNIA (28 mgd)
Designed complete security and fire alarm systems.
Assisted with electrical design and review of power distribution
system.
Designed electrical, instrumentation, and controls
for chemical systems and 1.5-million-gallon storage tank.
As part of a water system SCADA design, designed
complete plant control system replacements for two treatment plants.
-
CASTELLA, CALIFORNIA (300,000 gpd)
Designed complete electrical and control systems
for a storage and ultraviolet disinfection facility.
-
FRENCH GULCH, CALIFORNIA (350,000 gpd)
Design of all electrical and control systems.
Designed electrical and lighting modifications to
East Bay Municipal Utility District washwater facility.
Conceptual design of instrumentation and control
systems for recycled water delivery system throughout the East San
Francisco Bay Area.
|